皇冠官网开户(www.hg108.vip):KPower gets four-year PPA extension

2022-08-25 4 views 0

扫一扫用手机浏览

澳洲幸运5玩法www.a55555.net)?澳洲幸运5是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

皇冠官网开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠官网开户的平台。皇冠官网开户(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

Allbet欧博官网内容转载自互联网,如有侵权,联系Allbet欧博官网删除。

本文链接地址:http://www.zzxslszjx.com/post/10039.html

相关文章

发表评论