Fukushima debris removal delayed by another year

2022-08-28 4 views 0

扫一扫用手机浏览

Telegram游戏www.tel8.vip)是一个Telegram群组分享平台。Telegram游戏包括Telegram群成员导出、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram游戏为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

在线博彩平台www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。在线博彩平台上最新在线博彩平台登录线路、在线博彩平台代理网址更新最快。在线博彩平台开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

Allbet欧博官网内容转载自互联网,如有侵权,联系Allbet欧博官网删除。

本文链接地址:http://www.zzxslszjx.com/post/10330.html

相关文章

发表评论